About BOGEQI
Foshan Bogeqi Furniture Co., Ltd. designs and builds custom stainless steel wine cabinets, wine cellars and wine racks in Shunde, Foshan — the same district that supplies most of the stainless steel kitchen and bar work exported from China.
What we actually make
Custom stainless steel wine cabinets, walk-in wine cellars, open bottle racks and bar cabinetry. Almost nothing we make is a catalogue item: the frame is folded to a measured wall, the cradle pitch is set to the bottles the client stores, and the finish is chosen from 63 stainless surfaces or matched to a physical sample.
Why stainless rather than timber
A cellar is a damp box. Timber moves with humidity, and a door that moved 2 mm last summer will not close the same way this summer. Stainless does not move, it does not absorb smell, and it can be wiped down without lifting a finish. The trade-off is that it is colder to the touch and it shows a fingerprint — which is why the finish matters more than the metal.
Who you deal with
The export desk handles the drawings, the quotation and the schedule. The person who answers your first email is the person who signs off the measured drawing, which is unusual enough in this trade to be worth saying.
What we are not
We are not a brand with showrooms in your city, and we do not pretend to be. We are a factory that exports, which means the value is in the drawing and the build, and the relationship is direct.
Where we ship
North America, the EU, the Middle East and Australia. Cooling is specified per market: 110 V / 60 Hz for the US and Canada, 220–240 V / 50 Hz elsewhere, always with a standard Embraco compressor so a local refrigeration engineer can service it.
The company
- Legal name
- Foshan Bogeqi Furniture Co., Ltd.
- Brand
- BOGEQI · 博格奇
- Location
- Shunde District, Foshan, Guangdong, China
- Made here
- Frame, finish, assembly, cooling integration, crating
- Export markets
- US, Canada, EU, Middle East, Australia
- Contact
- sales@bogeqi.com
What exists today
Frames, finishes, cooling integration and crating happen in one building. These four frames are the floor itself: units standing in the hall between stages.




How the company is set up to deliver
- Made in
- Shunde, Foshan, China — frame, finish and assembly in one workshop
- Frame
- 18 mm stainless sightline, folded to the measured wall
- Materials
- Stainless steel, tempered or low-E glass, felt-lined bottle cradle
- Cooling
- Embraco compressor, 110 V / 60 Hz for the US, 220–240 V elsewhere
- Production
- 30 to 40 days after the 50% production deposit, quoted per project
- Delivery
- Crated, collected by your forwarder, with a numbered setting-out drawing
- Installation
- By your fitter, to our drawing; we dry-fit and inspect before crating
Three rules that shape every order
These are the constraints we hold ourselves to, not marketing lines.
Build to the measured drawing
Not to the enquiry, not to the assumption. The measurement sits between scheme confirmation and the production deposit for exactly this reason.
Show the real thing
Photographs on this site are of finished cabinets and installed rooms. Where we do not have a photograph of something, the page says so rather than borrowing one.
Quote a range, not a promise
Production is quoted as 30 to 40 days because that is the honest range across finishes and cooling options. A single number would be a sales answer.

Talk to the export desk
Send the wall, the bottle count and the finish direction. The first answer costs nothing and usually includes two or three options you had not considered.
