Poly Xiutai Tianjun Tower 2
The client wanted the wine visible from the dining table and again the moment the front door opens. Two separate stainless runs, one finish.
- Location
- Foshan, Guangdong
- Space
- Dining wine cabinet and entry cellar
- Specification
- Dining run + entry cellar · champagne gold
- Scope
- Two stainless runs in one finish, measured on site before the re-draw
What was built
Two runs, one finish. The dining cabinet is set to be read from the table, and the entry cellar is the first thing visible when the front door opens. Champagne gold is what holds the two together without either reading as a separate piece of furniture.
How it was handed over
Both locations sit on one drawing set. Dining run and entry cellar were measured together, so the finish and the frame sightline were confirmed once rather than twice.
Nothing was cut before the measured drawing was confirmed. The unit was then dry-fit, inspected, photographed and filmed in Foshan, and crated against a numbered setting-out drawing for the client fitter.
Installed, in the room
Photographs taken on site after installation. No renders.









How this one was built
- Made in
- Shunde, Foshan, China — frame, finish and assembly in one workshop
- Frame
- 18 mm stainless sightline, folded to the measured wall
- Materials
- Stainless steel, tempered or low-E glass, felt-lined bottle cradle
- Cooling
- Embraco compressor, 110 V / 60 Hz for the US, 220–240 V elsewhere
- Production
- 30 to 40 days after the 50% production deposit, quoted per project
- Delivery
- Crated, collected by your forwarder, with a numbered setting-out drawing
- Installation
- By your fitter, to our drawing; we dry-fit and inspect before crating

Want a project like this one?
Send the room size and the bottle count for a layout, a finish direction and a price.